Design Project Manager – Data Center Construction

atTurner & TownsendRemoteUS flagNew MexicoFull-timeProject ManagerSeniorLead$160k – $180k/year

Posted Aug 27

This is a fully remote position, open to applicants in New Mexico.

πŸ“‹ Description

β€’ Oversee insurer design compliance for a range of new data center projects.

β€’ Evaluate potential sites and developer designs in relation to insurer requirements during the pre-lease due diligence phase.

β€’ Assist the transaction team with insurer requirements, lease documentation, and performance specifications.

β€’ Manage open insurer review issues until resolution with developers, general contractors, and subcontractors.

β€’ Facilitate coordination among the client design team, insurer, and developer to ensure insurer design compliance.

β€’ Maintain compliance tracking matrices for projects, including open items, evidence, responsible parties, status, and schedule impact.

β€’ Analyze developer design submissions and insurer plan review letters to pinpoint non-compliance issues and outstanding evidence.

β€’ Organize and lead collaborative sessions with design and trade partners.

β€’ Participate in regular insurer coordination meetings and provide updates on portfolio status.

β€’ Create weekly status reports detailing blocking items, progress, actions, and impacts on milestones.

β€’ Convey insurer requirements and provide guidance on acceptable compliance methods.

β€’ Prepare and assist with deviation or exemption requests, including related evidence and impact assessments.

β€’ Monitor insurer review timelines and escalate any delays that affect scheduling.

β€’ Develop checklists, standard requirement packages, and template documentation.

β€’ Simultaneously manage multiple fast-paced projects.

β€’ Comply with SOX control responsibilities where applicable.


⛳️ Requirements

β€’ At least 8 years of experience in design management, design coordination, or technical project management within the construction sector.

β€’ Preferred experience in data centers or mission-critical facilities.

β€’ Consideration will be given to experience with other complex or heavily regulated building types.

β€’ Working knowledge of architectural, structural, and fire protection design is essential.

β€’ Familiarity with electrical and mechanical systems adequate for cross-discipline coordination.

β€’ Understanding of US building and fire codes is required.

β€’ Experience with insurer-led or third-party design approval processes is preferred.

β€’ Capability to track and resolve technical items across multiple simultaneous projects.

β€’ Proficient in reading and interpreting drawings, specifications, and technical submittals.

β€’ Strong written and verbal communication skills are necessary.

β€’ Ability to summarize technical status for senior stakeholders effectively.

β€’ Proficient in MS Office Suite and Google Workspace.

β€’ US PST time zone coverage is required.

β€’ Occasional travel to project sites may be necessary.


🏝️ Benefits

β€’ Bonuses may be available in addition to the base salary.

β€’ Comprehensive benefits package offered.

β€’ Enjoy a healthy, productive, and flexible working environment.

β€’ Support for work-life balance provided.

β€’ Remote work options may be available for qualified candidates.

β€’ Commitment to an equal opportunity and inclusive workplace.

People also viewed

[Bulle & Mensch] – So handeln Profis wirklich.23 hours ago

Freelance Project Manager

DE flagGermany OnlyFreelanceProject Manager€0 – €1/year
ApplyView job
Nor-Cal Controls ES, Inc.1 day ago

Project Manager I

US flagCalifornia OnlyFull-timeProject Manager$85k – $105k/year
ApplyView job
Mercor1 day ago

Project Manager

US flagUnited States OnlyFreelanceProject Manager$50 – $60/hour
ApplyView job
SCALIA - Global People Operations Agency1 day ago

Project Manager

US flagUnited States OnlyPart-timeProject Manager
ApplyView job
NEI Electric Power Engineering, Inc.2 days ago

Team Lead – Project Management, Utilities

US flagColorado OnlyFull-timeProject Manager$90k – $150k/year
ApplyView job
Amgen2 days ago

Senior Associate Project Manager

US flagUnited States OnlyFull-timeProject Manager$89.2k – $120.6k/year
ApplyView job

Never miss a great job!

Get handpicked remote jobs straight to your inbox weekly.

Trusted by 7,400+ designers