
Site Engineering & Design Manager β Data Center Construction
Posted Sep 17

Posted Sep 17
This is a fully remote position, open to applicants in California.
β’ Oversee and uphold the project RFI register until resolution is achieved.
β’ Evaluate, categorize, draft, coordinate approvals, and escalate RFIs as needed.
β’ Track RFI progress, due dates, response times, and audit trails.
β’ Organize multidisciplinary design deliverables, review cycles, and resolution of comments.
β’ Monitor design risks, unresolved issues, and action items.
β’ Lead design coordination meetings, managing agendas, documentation, and action items.
β’ Identify and communicate any bottlenecks in the design process.
β’ Maintain documentation related to design basis, RFI registers, submittal logs, design issue logs, and lessons learned databases.
β’ Foster collaboration among stakeholders, consultants, contractors, and client teams.
β’ Prepare regular program reports detailing RFI metrics, design status, issue resolutions, and project risks.
β’ Analyze RFI patterns and recurring issues to enhance processes.
β’ Support RFI management protocols and governance procedures.
β’ Ensure adherence to documentation standards, approval workflows, and authority boundaries.
β’ Comply with relevant SOX control responsibilities.
β’ Bachelor's degree in Engineering, Architecture, Construction Management, or a related technical field, or an equivalent combination of education and experience.
β’ Over 5 years of experience in project engineering, design management, construction administration, or technical project coordination on large capital projects.
β’ Proven experience in supporting multidisciplinary design teams throughout design development, construction documentation, and construction phases.
β’ Strong understanding of RFI, submittal, and design change management processes.
β’ Experience with design-build, EPC, or traditional delivery methods.
β’ Proficient in Procore, Aconex, Autodesk Construction Cloud / BIM 360, or similar project collaboration tools.
β’ Excellent technical writing and documentation skills.
β’ Preferred: experience in supporting data centers, mission-critical, industrial, or large infrastructure projects.
β’ Preferred: knowledge of data center design fundamentals, including electrical distribution systems, mechanical cooling systems, building control systems, and reliability and redundancy concepts.
β’ Preferred: experience working within complex program management and governance environments.
β’ Preferred: background in commissioning, design validation, or construction quality processes.
β’ Bonuses may be available.
β’ Comprehensive benefits package.
β’ Flexible working environment.
β’ Work-life balance support.
β’ Equal opportunity and inclusive workplace.
DocPlanner
The New York Times
Tithe.ly
Get handpicked remote jobs straight to your inbox weekly.