Design Project Lead – Data Center Construction

atTurner & TownsendRemoteUS flagCaliforniaFull-timeDesignerSenior$160k – $190k/year

Posted 5 days ago

This is a fully remote position, open to applicants in California.

📋 Description

• Manage design and construction administration as an Owner’s Representative.

• Serve as a subject matter expert across Civil, Structural, Landscape, and Architecture disciplines.

• Collaborate with internal stakeholders, external engineers of record, general contractors, and regulatory bodies.

• Ensure the safe, timely, and budget-conscious delivery of data center capacity, maintaining high quality standards.

• Support and report to designated Project Managers or Project Directors.

• Assist in managing, coordinating, and overseeing projects throughout all design and construction stages.

• Guarantee the highest level of client service delivery.

• Prepare various documentation including reports, schedules, invoices, RFIs, submittals, meeting minutes/agendas, daily reports, change orders, inspections, closeout documents, and client presentations.

• Maintain project data within project management software.

• Coordinate project team meetings effectively.

• Communicate conceptual designs and uphold project documentation standards.

• Maintain Basis of Design, prototype designs, and template specifications for architectural components.

• Review and provide feedback on design RFPs.

• Oversee external design consultants throughout the design and construction process.

• Convey design standards to both internal and external partners.

• Manage multiple fast-paced projects concurrently.

• Create innovative solutions to minimize costs without compromising quality or reliability.

• Comply with relevant SOX control responsibilities.


⛳️ Requirements

• Bachelor's Degree in Business Administration, Construction Management, Engineering, or Architecture.

• Over 8 years of experience in the design, construction, and/or operations of mission-critical buildings.

• Experience in managing projects within large-scale construction programs.

• Background in Design, Architecture, and Civil works.

• Proficient with AutoCAD, Revit, Bluebeam, and the MS Office Suite.

• Strong presentation abilities.

• Capability to excel in a client-facing role.

• Ability to work collaboratively as an effective team player.


🏝️ Benefits

• Flexible working environment.

• Support for work-life balance.

• Commitment to equal opportunity and an inclusive environment.

• Confidential treatment of all information.

• No-fee recruitment process.

People also viewed

ICF1 day ago

Substation Protection & Control Designer

US flagTennessee OnlyFull-timeDesigner$60.9k – $103.6k/year
ApplyView job
Local Crafts1 day ago

Hand Knitting & Crochet Pattern Designer

US flagOhio, +3 more statesFull-timeDesigner$55k – $65k/year
ApplyView job
Discovery Education1 day ago

Design Systems Lead

US flagUnited States OnlyFull-timeDesigner$157.5k – $174.9k/year
ApplyView job
Chemin AI1 day ago

Creative Infographic Designer

MY flagMalaysia, +2 more countriesFreelanceDesigner$3/hour
ApplyView job
ICF1 day ago

Substation Protection & Control Designer

US flagTennessee OnlyFull-timeDesigner$60.9k – $103.6k/year
ApplyView job
Keywords Studios1 day ago

Senior Designer

PH flagPhilippines OnlyFull-timeDesigner
ApplyView job

Never miss a great job!

Get handpicked remote jobs straight to your inbox weekly.

Trusted by 7,400+ designers