
Associate Director, Site Engineering β Data Center Construction
Posted Sep 17

Posted Sep 17
This is a fully remote position, open to applicants in California.
β’ Oversee and uphold the project RFI register.
β’ Assess, categorize, draft, coordinate, and escalate RFIs until resolution.
β’ Track the status of RFIs, including due dates, turnaround times, and audit trails.
β’ Coordinate design deliverables, review cycles, and comment resolution across various disciplines such as architectural, structural, mechanical, electrical, controls, and specialty fields.
β’ Monitor design risks, unresolved issues, and action items.
β’ Organize design coordination meetings, managing agendas, documentation, and action items.
β’ Identify and relay design process bottlenecks that impact project execution or construction.
β’ Maintain documentation of design basis, RFI registers, submittal logs, design issue logs, and lessons learned databases.
β’ Foster collaboration among stakeholders, consultants, contractors, and client teams.
β’ Generate regular program reports detailing RFI metrics, design status, issue resolution, and project risks.
β’ Examine RFI trends and recurring issues to enhance processes and design clarity.
β’ Support protocols for RFI management, governance procedures, documentation standards, approval workflows, and authority boundaries.
β’ Comply with applicable SOX control responsibilities.
β’ Bachelor's degree in Engineering, Architecture, Construction Management, or a related technical field, or a comparable combination of education and experience.
β’ Over 8 years of experience in project engineering, design management, construction administration, or technical project coordination on large capital projects.
β’ Proven experience assisting multidisciplinary design teams through the design development, construction documentation, and construction phases.
β’ Strong understanding of RFI, submittal, and design change management processes.
β’ Experience in design-build, EPC, or traditional delivery models.
β’ Proficient with project information management platforms such as Procore, Aconex, Autodesk Construction Cloud/BIM 360, or similar systems.
β’ Excellent technical writing and documentation abilities.
β’ Preferred: experience in supporting data center, mission-critical, industrial, or large infrastructure projects.
β’ Preferred: knowledge of data center design fundamentals, including electrical distribution systems, mechanical cooling systems, building controls systems, and concepts of reliability and redundancy.
β’ Preferred: experience in sophisticated program management and governance environments.
β’ Preferred: exposure to commissioning, design validation, or construction quality processes.
β’ Bonuses may be available.
β’ Comprehensive benefits package.
β’ Healthy, productive, and flexible working environment.
β’ Support for work-life balance.
β’ Inclusive and diverse workplace.
β’ Opportunity to drive change.
β’ Commitment to equal opportunity employment.
Element
Sezzle
Get handpicked remote jobs straight to your inbox weekly.