
Senior Cost Manager / Quantity Surveyor – Data Center Construction
Posted Aug 8

Posted Aug 8
This is a fully remote position, open to applicants in Texas.
• Lead a significant, multi-phase data center construction initiative in the Greater Austin area.
• Act as a primary daily point of contact for stakeholders.
• Oversee costs, provide commercial guidance, and maintain financial controls throughout the project duration.
• Estimate and negotiate change orders during the construction process.
• Generate and present cost plans and estimates.
• Evaluate cost estimates created in collaboration with design teams and contractors.
• Reconcile variations and confirm the accuracy of contractor data.
• Collect status updates and prepare revisions to cost estimates.
• Draft written feedback and executive summaries on submissions from contractors.
• Coordinate cost data from contractors, subcontractors, suppliers, architects/engineers, and project stakeholders.
• Guide engineering priorities based on cost implications.
• Oversee cost assessments, valuations, cost impact evaluations, contingency management, and commitment tracking.
• Prepare funding presentations and facilitate value engineering discussions.
• Provide commercial insights for design options and value engineering.
• Assess pricing from contractors and subcontractors, leading client-side negotiations.
• Conduct quantity surveying, cost controlling, and change management.
• Supervise cost auditing, valuation, and validation processes.
• Generate monthly cost reports for clients.
• Negotiate and finalize accounts promptly.
• Compile records of built cost estimates and benchmark data.
• Mentor and develop talent.
• Manage commission margins, fee/resource forecasts, and financial reports using internal software.
• Execute internal business management systems, delivery methodologies, and tools.
• Comply with relevant SOX control responsibilities.
• Bachelor's degree in Construction Management, Cost Management, Quantity Surveying, Engineering, or a related construction field.
• At least 5-7 years of pertinent cost management experience in the construction sector.
• RICS accreditation or progress towards it is preferred.
• Proven experience leading cost management initiatives on medium to large-scale, moderately to highly complex construction projects.
• Experience in construction consultancy is highly preferred.
• Background in supporting large-scale commercial, industrial, campus, mission-critical, manufacturing, or similarly complex construction projects is favored.
• Strong understanding of construction industry technical aspects, procurement methods, value management, and value engineering.
• Exceptional communication and stakeholder management abilities.
• Experience in fast-paced project environments with multiple stakeholders and concurrent construction activities is preferred.
• Capability to work independently as well as collaboratively within a team.
• Ability to thrive in a client-facing role.
• Residing in the Greater Austin area and willing to travel occasionally to the project site.
• Remote work flexibility for local professionals.
• A healthy, productive, and adaptable working environment.
• Support for work-life balance.
• Commitment to equal opportunity and an inclusive workplace.
• Confidential management of information in accordance with EEO guidelines.
Sunbelt Rentals, Inc.
The Cigna Group
U.S. Bank
Get handpicked remote jobs straight to your inbox weekly.